THE HERON AT WATER STREET

Architectural
You are here:
THE HERON AT WATER STREET

LUXURY CONDOMINIUM BUILDING

Heron was move-in ready in March 2021, making it the first residential building to open at Water Street Tampa, a $3.5 billion mixed-use development from Lightning owner Jeff Vinik and an investment group led by Bill Gates.

–         420 apartments
–         Developer Strategic Property Partners

Project Size: 12,000 CY of Ready Mix Concrete

Highlights

–         Exposed structural architectural concrete
–         Innovative structural architectural components
–         Most decks were post tension (straight cement mixes)

Argos Portland-limestone cement (PLC) Type IL and Supplementary cementitious materials (SCMs) were used in most of the concrete mix designs (excludes precast elements).